Quoting rock pathway

I need help with quoting this job. I’m ripping these flagstone pavers out and redoing this.
This is what I was thinking.
Excavate 6” deep and level.
Pour 4” of gravel dust and compact it.
Weed barrier.
Metal edging
Lay pavers, sand under paver if needed for level.
Fill in gaps with 1-2” river pebble.
Done.
What do you think?
Rough dimensions are 4’ wide by 29’ long but the far end by the fence will be wider; approx. 9 feet wide there.

Originally by u/Adamc1217 on Reddit: https://tinyurl.com/28w9r2cl
Quoting rock pathway I need help with quoting this job. I’m ripping these flagstone pavers out and redoing this. This is what I was thinking. Excavate 6” deep and level. Pour 4” of gravel dust and compact it. Weed barrier. Metal edging Lay pavers, sand under paver if needed for level. Fill in gaps with 1-2” river pebble. Done. What do you think? Rough dimensions are 4’ wide by 29’ long but the far end by the fence will be wider; approx. 9 feet wide there. Originally by u/Adamc1217 on Reddit: https://tinyurl.com/28w9r2cl
0 Комментарии 0 Поделились 83 Просмотры